SHANDONG HUAYUAN BOILER · EST. 1968
[email protected]WhatsApp +86 158 6486 1976

HUAYUAN / PRODUCT SOLUTIONS

Industrial Thermal Oil Heaters

Thermal oil heating systems for production processes requiring controlled heat transfer. Selection is based on heat duty and supply/return temperatures.

MODEL & OPERATING PARAMETERS

Thermal oil heaters

Values below are from the published YLW model table. Heat duty is in MW, not steam tonnes per hour; the listed working temperature is 300 °C. Fuel and final operating conditions are confirmed for the selected unit.

Published models and selection parameters
Model / configurationOutputPressureBasis
YLW5.05 MW1.0 MPa300 °C; published model table
YLW66 MW1.0 MPa300 °C; published model table
YLW7.07 MW0.7 MPa300 °C; published model table
YLW9.59.5 MW1.0 MPa300 °C; published model table
YLW1212 MW1.0 MPa300 °C; published model table
YLW1414 MW1.0 MPa300 °C; published model table

Product data & references: Original YLW parameter sheet

Start with heat duty

Specify the required kW, MW or kcal/h, thermal-oil type and operating temperatures. Steam capacity in t/h is not used to size a thermal oil system.

Fuel and installation

Biomass, coal, oil or gas configurations are assessed against the fuel and process. Review circulation, expansion arrangements, controls and installation space with the engineering team.

PLAN YOUR BOILER PROJECT

What we need to specify your system

  • Required heat duty and thermal oil supply and return temperatures
  • Proposed fuel, available analysis and supply pattern
  • Process operating hours, project location and installation space

Product configuration & technical illustrations

The source diagrams below show product configurations. Confirm the final specification with our engineering team.

Thermal oil heater model and performance parameter table

Thermal oil heater installations with cylindrical and rectangular furnace sections

BEFORE YOU REQUEST A QUOTE

From process requirements to an agreed scope.

  1. Describe your process. Share the heating application, output, fuel and project country. Add operating hours, site conditions and the details you already know.
  2. Review the configuration. Discuss the boiler, fuel feeding, ash removal, water treatment, flue-gas cleaning and controls required by your project.
  3. Confirm the offer. Agree included equipment, exclusions, documentation, delivery, installation responsibilities, commissioning and support arrangements before ordering.
Can we use our available biomass fuel?

Send its origin, composition, moisture, particle size, ash content and photos. A reference using one fuel does not confirm suitability for another fuel or operating condition.

What determines the price and delivery schedule?

Capacity, working conditions, fuel properties, agreed auxiliaries, documentation and destination affect the offer. Price, production schedule, shipping terms and spare parts are confirmed for the agreed scope.

What documents and installation support are included?

Tell us your local requirements. The proposal should state the applicable documentation and the responsibilities for transport, installation and commissioning. See the supplied Chinese manufacturing licences and their validity dates; project-specific conformity requirements must be confirmed separately.

View manufacturing licences ↗

Prepare your boiler enquiry ↗

Keep the key details for your team.

Company background, product selection, verified references and an enquiry checklist in one short guide.

Download buyer guide · English PDF ↓

YOUR NEXT PROJECT

Let’s discuss your requirements.

Inquiry Form
Enlarged view of the selected image