
Project reference
25 t/h Biomass Steam Boiler in Karachi, Pakistan
A vertical biomass-fired steam boiler installation in Karachi, Pakistan. This project uses poultry manure fuel and illustrates Huayuan's…
View detailsBOILER MANUFACTURER · SINCE 1968
Steam, thermal oil and energy recovery systems from Shandong Huayuan Boiler. Coal, biomass, oil and gas solutions, designed around your process.
Boiler solutions
01Steam & thermal oil
Coal-fired systems for process steam and thermal oil heating.
View details ↗
02Steam & thermal oil
Turn agricultural and biomass residues into useful process heat.
View details ↗
03Steam & thermal oil
Boiler systems using fuel oil or natural gas.
View details ↗
04Municipal solid waste
Recover energy from municipal waste through purpose-built boiler systems.
View details ↗
05Energy recovery
Capture process heat for steam generation and improved energy use.
View details ↗
06Waste liquids, gases & solids
Integrated thermal treatment and steam generation for industrial wastes.
View details ↗
HUAYUAN · MANUFACTURINGFROM OUR WORKSHOP TO YOUR PLANT
Based in Linyi, Shandong, Huayuan brings boiler design, manufacturing and technical support together. Explore the people, equipment and research behind our thermal systems.
About usPROJECTS & APPLICATIONS

Project reference
A vertical biomass-fired steam boiler installation in Karachi, Pakistan. This project uses poultry manure fuel and illustrates Huayuan's…
View details
Project reference
An SHW20-2.5/400-T biomass-fired steam boiler project in Indonesia, using palm waste as fuel for industrial steam generation.
View details
Project reference
A 35 t/h vertical biomass steam boiler installation at an alcohol factory in Myanmar, using biomass pellet fuel.
View detailsCONNECTED TO YOUR MARKET
Focused on Pakistan and key industrial markets across Asia, the Middle East, Africa and South America.
Request a quoteFROM HUAYUAN

2026-08-13
Our company’s SHW25‑1.25‑T biomass‑fired reciprocating‑grate steam boiler, exported to Multan, Pakistan, is in the final‑stage installation of…
View details
2026-08-08
After 120 days of intensive installation and commissioning, our YLW biomass-fired thermal oil heater, with a capacity of 10 million kcal/h, was…
View details
2026-05-27
Our company's 18-ton/hour biomass pellet boiler at a certain company in Yinan has been officially put into operation.....
View detailsLET’S BUILD YOUR NEXT SYSTEM
Share your fuel, required output and project location. Our team can discuss a suitable boiler configuration with you.
[email protected] ↗WhatsApp: +86 158 6486 1976 ↗