SHANDONG HUAYUAN BOILER · EST. 1968
[email protected]WhatsApp +86 158 6486 1976

HUAYUAN / PRODUCT SOLUTIONS

Biomass Steam Boilers 10 t/h and Above

Industrial biomass steam boilers for plants with sustained process loads. Review 20, 25 and 35 t/h project references, then specify the output, pressure and fuel available at your site.

MODEL & OPERATING PARAMETERS

Biomass steam boilers

Our biomass steam boiler range covers 10–130 t/h with design pressures of 1.25–5.3 MPa. The design is selected for the required capacity, fuel and operating conditions. The individual project rows below retain their documented steam parameters.

Published models and selection parameters
Model / configurationOutputPressureBasis
Biomass steam boiler family10–130 t/h1.25–5.3 MPa (design)Current product range
SHW25-1.25/230-T25 t/h1.25 MPaPakistan delivery record; 230 °C steam
Vertical biomass boiler, Heze40 t/h2.5 MPaPublished operating project
SHW20-2.5/400-T20 t/hSee model-specific proposalIndonesia palm-waste project

Product data & references: Biomass catalogue · 25 t/h model record · 40 t/h pressure reference · Indonesia model reference

QUICK COMPARISON

Biomass boilers at a glance

Heating needUseful sizing information
Process steamOutput in t/h; working pressure and steam temperature.
Hot waterHeat duty in kW or MW; supply/return temperatures and system pressure.
Thermal oilHeat duty in kW or MW; oil type and supply/return temperatures.

For pellets, wood chips, sawdust or agricultural residues, share composition, moisture, particle size and ash content. Suitability, fuel feeding and combustion design are reviewed for the actual fuel.

Fuel-led boiler selection

Bagasse, rice husk, wood chips, sawdust and palm residues have different combustion and handling characteristics. We review the fuel analysis, supply consistency and plant load before proposing the furnace, grate and auxiliaries.

Designed around continuous production

Discuss normal and peak steam demand, load variation, maintenance access and critical spares. The rated output and operating conditions are established in the project-specific technical proposal.

What a 10 ton steam boiler enquiry should include

Start with the required steam output and pressure, production schedule, fuel type and project location. If the final demand is not known, choose “Help define the application” in the consultation form and share your production capacity.

PLAN YOUR BOILER PROJECT

What we need to specify your system

  • Available biomass, fuel size, moisture and ash content
  • Steam demand and pressure, or thermal oil operating temperature
  • Fuel supply consistency, operating hours and project location

Published steam boiler references

Reference outputs and fuels from the existing project records
ProjectSteam outputIdentified fuel
Indonesia20 t/hPalm-processing waste
Karachi, Pakistan25 t/hChicken manure, cow dung and rice husks
Myanmar35 t/hBiomass pellets

Product configuration & technical illustrations

The source diagrams below show product configurations. Confirm the final specification with our engineering team.

Biomass fuel examples: poultry manure, straw, cattle manure, palm residues and wood chips

Two views of an installed boiler with steel platforms and pipework

BIOMASS FUEL SELECTION

Rice straw first. A clear fuel specification.

Prioritise rice straw, cow manure, rice husk and wood chips. Confirm the acceptable heating-value, moisture and ash ranges from actual fuel analysis before agreeing the boiler design.

Additional wood-fuel illustration
AI illustration showing wood pellets on the left, wood chips in the centre and sawdust on the right
AI-generated fuel illustration. Actual fuel properties and suitability require project review.

Rice straw

Review preparation, feeding and ash behaviour. Share net heating value, moisture, ash and seasonal variation.

Cow manure

Report moisture, ash, impurities, bedding material and the proposed blend.

Rice husk

Provide analysis of the actual husk supply and describe storage and feeding conditions.

Wood chips

Specify chip size, moisture, ash and the consistency of supply.

No laboratory report yet?

Send the information you have and mark missing values as unknown. Fuel photos help describe the material but do not replace analysis. When providing a report, keep its units and test basis; do not enter zero for an unknown value.

See the published 18 t/h pellet case in Yinan, China ↗

This pellet reference does not confirm suitability for your wood chips or sawdust. Final configuration depends on the actual fuel and process requirements.

Discuss your fuel and heating requirement

BEFORE YOU REQUEST A QUOTE

From process requirements to an agreed scope.

  1. Describe your process. Share the heating application, output, fuel and project country. Add operating hours, site conditions and the details you already know.
  2. Review the configuration. Discuss the boiler, fuel feeding, ash removal, water treatment, flue-gas cleaning and controls required by your project.
  3. Confirm the offer. Agree included equipment, exclusions, documentation, delivery, installation responsibilities, commissioning and support arrangements before ordering.
Can we use our available biomass fuel?

Send its origin, composition, moisture, particle size, ash content and photos. A reference using one fuel does not confirm suitability for another fuel or operating condition.

What determines the price and delivery schedule?

Capacity, working conditions, fuel properties, agreed auxiliaries, documentation and destination affect the offer. Price, production schedule, shipping terms and spare parts are confirmed for the agreed scope.

What documents and installation support are included?

Tell us your local requirements. The proposal should state the applicable documentation and the responsibilities for transport, installation and commissioning. See the supplied Chinese manufacturing licences and their validity dates; project-specific conformity requirements must be confirmed separately.

View manufacturing licences ↗

Prepare your boiler enquiry ↗

Keep the key details for your team.

Company background, product selection, verified references and an enquiry checklist in one short guide.

Download buyer guide · English PDF ↓

YOUR NEXT PROJECT

Let’s discuss your requirements.

Inquiry Form
Enlarged view of the selected image