SHANDONG HUAYUAN BOILER · EST. 1968
[email protected]WhatsApp +86 158 6486 1976

HUAYUAN / PROJECT JOURNEY VIDEO

10 million kcal/h rice straw thermal oil heater | Pakistan textile mill

80-second video · Sound starts muted. Use the player controls to turn it on. Open video ↗

Explore a 10 million kcal/h rice-straw-fired biomass thermal oil heater for a textile mill in Pakistan. The project film follows workshop manufacturing, shipment, site assembly, thermal oil circulation, controls and fuel feeding.

Location
Pakistan
Application
Textile mill · Thermal oil heating
Heat duty
10 million kcal/h
Fuel
Rice straw
Stages
Manufacturing · Shipment · Installation · Circulation · Controls · Fuel feeding
Explore thermal oil systems ↗

Real project photographs and video supplied by Shandong Huayuan Boiler. Capacity, rice straw fuel and textile application confirmed by the company.
Published on this website: .

FROM OUR WORKSHOP TO THE TEXTILE MILL

A project shown through real equipment and site work.

Follow the manufacturing, packing, assembly and fuel-handling stages in the company’s original project photographs. This reference uses rice straw to supply thermal oil heating for a textile mill in Pakistan.

Thermal oil heater tube banks and headers being manufactured in Huayuan workshop
01

Heat-transfer manufacturing

Coils and headers in Huayuan’s workshop before shipment.

Large thermal oil heater component loaded onto a trailer inside Huayuan workshop
02

Prepared for dispatch

A large heater component loaded on a transport trailer at the factory.

Vertical thermal oil heater structure and platforms during installation in Pakistan
03

On-site assembly

Steel structure, heater body and access platforms during installation.

Thermal oil circulation pumps and connected red pipework at the textile mill
04

Thermal oil circulation

On-site circulation equipment and connected pipework.

Project team in the textile mill heater control room
05

Control room

The project team alongside the electrical control cabinets.

Covered biomass fuel conveyor and installed textile mill heating plant in Pakistan
06

Fuel-handling system

The covered conveyor and associated equipment at the installed plant.

Start with your process heat requirements.

For a new thermal oil system, share the required heat duty, supply and return oil temperatures, operating hours and available rice-straw analysis. Fuel moisture, ash content, heating value, storage and feeding arrangements help define the equipment configuration.

Explore thermal oil systems ↗

YOUR PROJECT

Discuss a similar requirement

Share your heat duty, thermal oil supply and return temperatures, rice-straw moisture and ash analysis, operating hours and site location.

WhatsApp Enlarged view of the selected image