SHANDONG HUAYUAN BOILER · EST. 1968
[email protected]WhatsApp +86 158 6486 1976

HUAYUAN / CAPABILITIES

Boiler Manufacturing & Processing Equipment

HUAYUAN IN ACTION · 20-SECOND VIDEO

On-site boiler assembly

Watch boiler components being lifted and assembled on site, with views of the steel structure, pipework and installation team.

Video supplied by Shandong Huayuan Boiler.

Video details & project requirements Discuss your boiler project
1280 × 720 · Click play to watch. Sound starts muted; use the player controls to turn it on. Open video ↗

HUAYUAN IN ACTION · 24-SECOND VIDEO

Biomass boiler construction in Pakistan

A close-up look at boiler tube banks and steelwork during installation. The company video identifies the site as Pakistan and is captioned 15 May 2025.

Video supplied by Shandong Huayuan Boiler.

Explore biomass boilers Video details & project requirements Discuss your boiler project
720 × 1280 · Click play to watch. Sound starts muted; use the player controls to turn it on. Open video ↗

DELIVERED PROJECT SITES · 30-SECOND VIDEO

Delivered project sites: boiler equipment photo film

A 30-second photo film of delivered Huayuan project sites, showing boiler structures, pipework, access platforms and plant exteriors. The delivery status is confirmed by Huayuan.

Project site images supplied by Shandong Huayuan Boiler; the delivered-project context was confirmed by Huayuan.

Video details & project requirements Discuss your boiler project
1280 × 720 · Click play to watch. Sound starts muted; use the player controls to turn it on. Open video ↗

INSIDE HUAYUAN

A closer look at our factory

Explore the factory, metalworking, welding and inspection equipment in a short film with Chinese–English captions and soft instrumental music.

Watch the factory tour ↗
37 seconds · Chinese–English captions · Sound starts muted.

INSIDE HUAYUAN

Documents behind our work.

Explore our company archive and an original customer reference.

View production licences ↗

Qualifications archive

Each original document is shown separately. Select any document to view it at full size.

The certificate collection is historical material; it does not indicate current validity.

Boiler manufacturing licenceView full image ↗
01Boiler manufacturing licence
Business registrationView full image ↗
02Business registration
Pressure vessel manufacturing licenceView full image ↗
03Pressure vessel manufacturing licence
View 5 more archive certificates
ASME authorization - UView full image ↗
04ASME authorization - U
ASME authorization - SView full image ↗
05ASME authorization - S
Environmental management certificateView full image ↗
06Environmental management certificate
Occupational health and safety certificateView full image ↗
07Occupational health and safety certificate
Quality management certificateView full image ↗
08Quality management certificate

CUSTOMER FEEDBACK

Customer reference

Retypeset from the original English letter. Original wording preserved.

View original PDF ↗

To whom it may concern

It is a great privilege to inform that we are using SHANDONG Flake Type Steam Boilers having model are as follow

SZL-25-1.25AII

With the help of SHANDONG HUAYUAN BOILER CO team, we get a complete end to end system including control panel of Steam boilers that enables us to efficiently manage all our resources and produce the required steam.

We are very satisfied with the service provided by SHANDONG HUAYUAN BOILER CO. We are congratulating you for such latest Technology Based product.

We wish you all the best for Future Growth

Regards
Muhammad Farooq
DGM Engineering utility

Photographs from the customer letter

Project photograph 01View full image ↗
01Project photograph 01
Project photograph 02View full image ↗
02Project photograph 02
Project photograph 03View full image ↗
03Project photograph 03
Project photograph 04View full image ↗
04Project photograph 04
Project photograph 05View full image ↗
05Project photograph 05
Project photograph 06View full image ↗
06Project photograph 06
Enlarged view of the selected image